Specialist Trade Estimating & Cost Management
20 Years EU, UK & Australian Expertise in High-Complexity Trades
From drylining to fire protection, facades to structural works— precision costing for the trades that matter most.
2,000+ specialist projects estimated across EU, UK & Australia
Deep expertise in Drylining, Fire Protection, Facades & Structural
Both supply-only and install packages covered
Compliance with international standards
Why Specialist Trades Need Specialist Estimators
The Problem
Generic estimators miss the complexity that specialist trades demand:
Drylining: Missing acoustic/fire rating multipliers, incorrect stud sizing
Fire Protection: Failing to account for certification costs, testing requirements
Facades: Overlooking installation sequences, weatherproofing complexity
Structural: Underestimating reinforcement, connection details, tolerances
Our Solution
Specialists who’ve worked IN the trades, not just estimated FOR them:
Hands-on experience installing drylining, fire systems, facades
2,000+ specialist packages estimated across 3 continents
Know the hidden costs: labor inefficiencies, material waste, rework risks
Understand compliance: fire ratings, structural calculations, wind load testing
Real-world estimating: not just BOQ—actual buildable costs
4 Specialist Areas of Expertise
Drylining & Partitions
What We Cover
- Metal stud framing systems (Knauf, Gyproc, Siniat)
- Plasterboard installation (standard, fire-rated, acoustic, moisture-resistant)
- Suspended ceilings (exposed grid, concealed, acoustic panels)
- Acoustic treatments and STC/Rw ratings
- Fire-rated partitions and compartmentation
Our Experience
- 200+ drylining projects estimated (offices, warehouses, residential)
- Worked with Knauf, British Gypsum, CSR Gyprock specifications
- Understand labor rates: crew sizing, productivity factors, site access constraints
- Know material waste factors: 8-15% depending on ceiling heights and cutting requirements
Typical Package Scope
- Full BOQ with material specifications
- Labor hours by system type (fire-rated = 1.3x standard productivity)
- Equipment/scaffolding requirements
- Testing and certification costs (fire ratings, acoustic performance)
- Warranty and defects liability
Critical Knowledge
- Acoustic sealant: often missed, adds 3-5% to material cost
- Fire-rated systems: labor productivity drops by 30-50%
- Height work: above 3.5m = 20% productivity decrease
- Curved walls: material waste increases to 20-25%
Deliverable: Detailed estimate with installation sequence, material schedule, labor allocation
Fire Protection Systems
What We Cover
- Passive fire protection (compartmentation, fire stopping, intumescent coatings)
- Active fire systems (sprinklers, detection, suppression)
- Fire-rated doors, windows, and penetrations
- Fire curtains and smoke control systems
- Structural fire protection (steel/concrete coatings)
Our Experience
- 150+ fire protection packages (warehouses, data centers, high-rise)
- Compliance with AS 1530.4, BS 476, EN 13501, Polish regulations
- Worked with Trafalgar, Hilti, Nullifire, FireMaster, Rockwool, Titan systems
- Understand certification requirements: 3rd party testing, BCA/NCC compliance
- Know labor complexity: confined spaces, sequential installation, coordination
Typical Package Scope
- Fire strategy review and compartmentation schedule
- Material specifications with fire ratings (FRL 60/60/60, 90/90/90, etc.)
- Installation labor with access/coordination factors
- Testing and commissioning (smoke tests, pressure tests)
- Authority approvals and certification documentation
Critical Knowledge
- Fire ratings ≠ installation costs
- Penetration sealing: per penetration (not per square meter)
- Intumescent coatings: surface prep = 40% of total cost
- Testing & certification: can be 5-8% of package value
- Coordination with other trades: critical for sequencing
Deliverable: Fire protection cost estimate with compliance roadmap
Facades & Cladding
What We Cover
- Rainscreen cladding systems (terracotta, fiber cement, metal panels)
- Curtain wall systems (unitized, stick-built)
- Insulated panels (PIR, mineral wool, sandwich panels)
- Facade access systems (BMU, gantries, cradles)
- Weatherproofing and sealant systems
Our Experience
- 120+ facade projects (warehouses, offices, high-rise residential)
- Material systems: Kingspan, Trespa, Equitone, Alucobond, Cemintel
- Understanding wind loading calculations and structural integration
- Complex installation sequences: scaffolding, craneage, weather delays
- Know material cost volatility: metal panels = 15-25% price fluctuation risk
Typical Package Scope
- Facade BOQ by elevation and system type
- Substructure (rails, brackets, fixings) fully detailed
- Labor by height zone
- Access equipment (scaffolding, BMU hire, safety systems)
- Testing (water penetration, air tightness, thermal performance)
Critical Knowledge
- Facade = 15-25% of building cost but 40% of tender risks
- Installation speed: 8-15 sqm/day depending on system complexity
- Weather delays: factor 10-20% contingency time
- Sealant replacement: budget 2-5% total for remedial works
- Access equipment: can be 15-20% of installation cost
Deliverable: Facade cost estimate with installation methodology
Structural Works
What We Cover
- Structural steel (frames, trusses, bracing)
- Reinforced concrete (suspended slabs, columns, cores)
- Post-tensioned slabs and beams
- FRP (fiber-reinforced polymer) strengthening
- Structural connections and tolerances
Our Experience
- 180+ structural packages (warehouses, bridges, high-rise, houses)
- Steel: fabrication + erection + painting + fire protection
- Concrete: formwork + reinforcement + pour + cure + finish
- Complex calculations: load paths, connection detailing, construction sequences
- Material pricing: rebar = commodity risk, structural steel = fabrication lead times
Typical Package Scope
- Structural steel schedule (tonnage, connection types, erection sequence)
- Concrete schedule (volumes, reinforcement density, formwork complexity)
- Testing requirements (NDT, load testing, concrete strength)
- Temporary works (propping, scaffolding, safety systems)
- Coordination with MEP and architectural trades
Critical Knowledge
- Structural steel: fabrication 40%, erection 35%, painting/fire 25%
- Post-tensioned slabs: 15-20% more material cost but 30% faster construction
- Connection complexity: simple = €50/connection, moment = €500+
- Concrete pump hire: €1,500-2,500/day including operator
- Reinforcement fixing: 8-12 hours per tonne average
Deliverable: Structural cost estimate with construction methodology
Our Proven Specialist Estimating Process
Step 1: Trade-Specific Scope Definition
Duration: 2-3 days
What We Do: - Deep-dive review of drawings and specifications - Identify trade-specific complexities (fire ratings, acoustic requirements, wind loads) - Assess installation constraints (access, sequencing, coordination) - Define exact scope boundaries and interfaces with other trades
Your Investment: Free initial review (1-2 hours)
Key Output: Scope clarification document with identified complexities
Step 2: Specialist Material Takeoff
Duration: 2-4 days
What We Do: - Measure quantities with trade-specific accuracy - Include waste factors based on system type (drylining 10-15%, facades 8-12%) - Identify long-lead items and procurement risks - Verify material compatibility and approval requirements
Deliverable: Detailed BOQ with manufacturer specifications
Accuracy Level: ±2% on quantities
Step 3: Installation Labor Analysis
Duration: 2-3 days
What We Do: - Calculate crew sizes and productivity rates - Factor in complexity multipliers (fire-rated = 1.3-1.5x, height = 1.2-2x) - Include access equipment and temporary works - Account for weather delays and site constraints
Deliverable: Labor schedule with resource allocation
Based On: Real project data from 2,000+ installations
Step 4: Compliance & Testing Budget
Duration: 1-2 days
What We Do: - Identify testing requirements (fire ratings, structural load tests, facade testing) - Budget for certifications and authority approvals - Include quality control and commissioning - Factor in warranty and defects liability periods
Deliverable: Compliance cost schedule
Often Missed: 3-8% of package value in testing/certification
Step 5: Risk Assessment & Contingency
Duration: 1 day
What We Do: - Identify material price volatility risks - Assess installation risks (weather, access, coordination) - Calculate appropriate contingency (5-15% depending on package complexity) - Provide value engineering alternatives
Deliverable: Complete specialist estimate with risk register
Risk Mitigation: Identified savings opportunities typically 10-15%
Total Timeline: 8-13 working days | Project Duration: 2-3 weeks from start to finish
Fast-Track Available: Urgent estimates in 5-7 working days (30% surcharge)
6 Key Benefits of Specialist Estimating
1. Accuracy That Matters
Generic Estimators
±15-20% variance
Our Specialists
±3-5% accuracy
Based on 2,000 real projects tracked to completion
3. Compliance Built-In
From day one, not discovered during construction: - Fire ratings (AS, BS, EN standards) - Structural calculations - Wind load testing - Acoustic performance tests - Authority approvals - Third-party certification
4. Installation Reality
Labor rates based on: - Actual crew productivity - Site access constraints - Weather impact factors - Coordination requirements - We’ve done the work - not theoretical textbook numbers
5. Material Knowledge
Deep manufacturer expertise: - Know which systems work together - Understand lead times (4-16 weeks) - Track price volatility risks - Identify equivalent alternatives - Kingspan ≠ Metecno ≠ Ruukki in installed cost
6. Risk Management
Every package includes: - Comprehensive risk register - Probability assessments - Impact analysis - Mitigation strategies - Contingency recommendations - Value engineering options
Frequently Asked Questions
Q: What makes specialist trade estimating different from general estimating?
A: Specialist estimators have hands-on installation experience and understand the nuances that affect costs: fire-rated systems require specific installation sequences, facade work is weather-dependent, and structural connections have hidden complexity. We account for factors that generic estimators often miss, resulting in ±3-5% accuracy versus ±15-20% for general estimates.
Q: Do you work with specific material systems only?
A: No. We have experience with all major systems (Knauf, Gyproc, Siniat, Kingspan, Trespa, Hilti, etc.) and can estimate any manufacturer’s products. Our expertise is in understanding the installation and performance characteristics, not brand loyalty. We often provide value engineering alternatives using different systems.
Q: Can you estimate supply-only packages?
A: Yes. We provide estimates for supply-only, install-only, or complete supply & install packages. Each requires different considerations for waste factors, logistics, and risk allocation. Supply-only typically includes 5-8% waste, while install packages factor 10-15% waste depending on complexity.
Q: How do you handle compliance requirements?
A: We budget for all testing, certification, and approval costs from the start. This includes fire ratings (AS 1530.4, BS 476, EN 13501), structural load testing, facade performance testing, and authority approvals. These costs, often 3-8% of package value, are frequently missed in generic estimates.
Q: What information do you need to provide an estimate?
A: Ideally: architectural drawings, specifications, material preferences, and any performance requirements (fire ratings, acoustic performance, wind loads). For complex projects, we may request structural drawings and coordination plans. We can work with preliminary information and refine as details become available.
Q: Do you provide value engineering alternatives?
A: Absolutely. Every specialist estimate includes value engineering recommendations: alternative material systems, installation methods, and performance-equivalent substitutions that can reduce costs without compromising quality. Typical savings opportunities range from 10-20% of package value.
Q: What project sizes do you handle?
A: We work on projects from small fit-outs (500 sqm) to large-scale developments (50,000+ sqm). Specialist trade complexity matters more than overall project size—a high-rise facade is more complex than a large warehouse drylining package. Minimum fee applies for projects under €500,000.
Q: Do you support tendering processes?
A: Yes. We provide full tender support: quantity take-off, detailed cost breakdown, risk analysis, bid document preparation, and contractor evaluation. Our estimates give you confidence in your tender submissions. We can also attend tender interviews and negotiations.
Q: How quickly can you provide an estimate?
A: Standard timeline is 2-3 weeks for comprehensive specialist estimates. For urgent requirements, we offer fast-track service (5-7 working days) with a 30% surcharge. Initial budget estimates can be provided within 48 hours for feasibility studies.
Q: Do you work internationally?
A: Yes. While based in Poland, we have extensive experience with EU, UK, and Australian standards. We’ve completed projects across Europe, Asia-Pacific, and the Middle East. Our estimates include location factors for labor and material costs.
Ready for Specialist-Level Accuracy?
Don’t Let Hidden Complexity Blow Your Budget
Get estimates from specialists who’ve actually done the work.
Free Specialist Review
Send drawings, get complexity assessment within 24h
Download Trade Guides
“Specialist Trades Estimating: The 12 Costs Everyone Misses” (18-page PDF)
Get Specialist Quote
3-minute form, quote within 48 hours
2,000+ Specialist Projects
20 Years EU/UK/AU Experience
±5% Accuracy
Our Specialist Credentials
Experienced Surveyor
Quantity Surveyor
20 Years
Field Experience
Serving Whole World
Global Projects
±3-5%
Accuracy Rate
€2.5B
Projects Valued
Need Immediate Help?
Call: +44 (0) 20 3239 9967 | Email: info@bimtakeoff.com
Office Hours: Monday-Friday, 9:00-17:00 CET | Response Time: Within 4 hours
Emergency Estimates: Available for urgent tenders (48-hour turnaround)