MEP Infrastructure Precision | Mechanical Electrical Plumbing Cost Estimation | BIM Takeoff
MEP Infrastructure Precision Costing
Complex Systems Estimated with Surgical Precision
Detailed MEP takeoffs from coordinated BIM models.
Clash-free quantities with ±3% accuracy.
Full M&E Coordination - Mechanical, Electrical, Plumbing, Fire
Clash Detection Integrated - Pre-validated quantities
Complex Systems Specialist - Data centers, industrial, healthcare
The MEP Cost Challenge
Traditional MEP Estimating Fails
Mechanical, Electrical & Plumbing represent 30-50% of project costs but are often poorly estimated:
Allowance-based pricing (£/sqm, £/kW)
Incomplete takeoffs miss small-bore pipework
Clashes discovered during installation
Coordination costs underestimated
Testing & commissioning overlooked
Integration complexity not priced
Our BIM-First Solution
Coordinated 3D model extraction with full system integration:
Clash-free quantities from coordinated models
Every component counted - fittings, fixings, accessories
System-by-system validation by MEP specialists
Coordination & testing costs included
Controls & BMS integration priced
Performance guarantees factored
MEP Systems We Cost
HVAC Systems
Heating, Cooling & Ventilation
- Chillers & boilers
- AHUs & FCUs
- Ductwork (all sizes)
- VAV & VRF systems
- Heat pumps
- Pipework & insulation
- Controls & BMS
Complexity: High-rise, clean rooms, laboratories
Electrical Systems
Power & Distribution
- HV/LV switchgear
- Transformers & UPS
- Generators & ATS
- Distribution boards
- Cable containment
- Lighting & controls
- Emergency systems
Specialties: Data centers (Tier III/IV), industrial loads
Plumbing & Drainage
Water & Waste
- Hot/cold water systems
- Domestic water booster sets
- Drainage above/below ground
- Rainwater harvesting
- Greywater recycling
- Pumping stations
- Water treatment
Applications: High-rise, industrial process water
Fire Protection
Life Safety Systems
- Sprinkler systems
- Fire alarms & detection
- Smoke control/extract
- Dry/wet risers
- FM200/gas suppression
- Emergency lighting
- Voice alarms
Standards: BS 9999, BS EN 12845, NFPA
Data & Comms
IT Infrastructure
- Structured cabling
- Fiber optic networks
- Server room cooling
- UPS & power distribution
- Cable management
- CCTV & access control
- AV systems
Expertise: Hyperscale data centers, mission-critical
Building Controls
Integration & Automation
- BMS/SCADA systems
- DDC controllers
- Metering & monitoring
- Integration protocols
- Dashboards & analytics
- Predictive maintenance
- IoT sensors
Platforms: All major BMS suppliers
Our MEP Costing Process
Model Coordination Review
Duration: 2-3 days
What We Do:
- Review MEP BIM models (Revit MEP, AutoCAD MEP)
- Run clash detection (Navisworks, Solibri)
- Validate system completeness
- Check specification compliance
- Verify equipment schedules
- Assess LOD (Level of Detail)
Deliverable: Model quality report with clash register
System-by-System Extraction
Duration: 4-6 days
What We Do:
- Extract quantities per system
- Include all fittings & accessories
- Account for coordination routes
- Calculate labor allowances
- Include testing & commissioning
- Price controls integration
- Add performance testing
Deliverable: Detailed MEP Bill of Quantities
Specialist Sub-System Costing
Duration: 3-4 days
What We Do:
- Price complex equipment (chillers, UPS, generators)
- Cost specialist installations (clean rooms, labs)
- Include factory testing/witnessing
- Calculate crane/plant requirements
- Price temporary services
- Include spares & training
Deliverable: Sub-system cost schedules
Integration & Coordination Costing
Duration: 2-3 days
What We Do:
- BMS integration programming
- Multi-discipline coordination
- Testing & commissioning sequences
- Performance verification
- Handover documentation
- O&M manual production
Deliverable: Integration cost breakdown
Risk & Contingency Assessment
Duration: 1-2 days
What We Do:
- Identify MEP-specific risks
- Assess design development stage
- Price coordination contingencies
- Model equipment lead times
- Evaluate installation complexity
- Recommend risk mitigation
Deliverable: MEP risk register with contingency recommendation
Final Cost Reporting
Duration: 2 days
What We Do:
- Consolidate all MEP costs
- Create system-by-system breakdown
- Prepare elemental cost plan
- Compare to benchmarks
- Present findings & recommendations
- Provide value engineering options
Deliverable: Comprehensive MEP cost report
Total Timeline: 14-20 working days
Total Project Duration: 3-4 weeks for complete MEP cost plan
Specialist MEP Applications
Complex Environments We Excel In
Data Centers
Mission-Critical Infrastructure
- Tier III/IV compliance
- N+1, 2N redundancy
- Hot/cold aisle containment
- Power density 15-25 kW/rack
- Precision cooling
- Generator sizing & UPS
- Cable management systems
MEP Proportion: 60-70% of project cost
Healthcare Facilities
Critical Care Environments
- HTM 03-01 ventilation
- Medical gas systems
- Infection control measures
- Theatre ventilation
- Critical power systems
- Nurse call integration
- Decontamination facilities
MEP Proportion: 45-55% of project cost
Industrial Manufacturing
Process & Production
- Compressed air systems
- Process cooling/heating
- Dust/fume extraction
- High-load electrics (3-phase)
- Effluent treatment
- Steam generation
- ATEX compliance
MEP Proportion: 40-50% of project cost
Laboratories
Research Facilities
- Fume cupboard systems
- Process gases
- Specialist ventilation
- Contamination control
- Wash-down facilities
- Emergency systems
- Environmental monitoring
MEP Proportion: 50-60% of project cost
Frequently Asked Questions
Q: What LOD (Level of Detail) do you need for accurate MEP costing?
A: LOD 300 minimum for ±5% accuracy, LOD 350-400 for ±3% accuracy. At LOD 300, we work with schematic routing and equipment schedules. LOD 350+ provides fabrication-level detail including all fittings, supports, and accessories. If your model is LOD 200, we can supplement with specifications and schematic drawings but accuracy reduces to ±10%.
Q: How do you handle MEP coordination costs?
A: We include coordination in our estimates as both time (coordination meetings, clash resolution) and material (re-routing costs, additional fittings). For complex projects, coordination can add 3-5% to MEP costs. We also model design development risk - how much design is still to be finalized and what impact that has on pricing certainty.
Q: Can you cost MEP for projects with uncoordinated models?
A: Yes, but we add coordination contingency (5-10%) to account for clashes that will be discovered and resolved during construction. We can also run clash detection as part of our service and provide a clash resolution cost estimate, helping you understand the coordination risk in monetary terms.
Q: Do you include testing & commissioning in estimates?
A: Absolutely. T&C is often 3-8% of MEP installation costs and frequently overlooked. We include: pre-commissioning, functional testing, performance verification, integration testing, witness testing, seasonal commissioning, and 12-month defects monitoring. Each system has specific testing requirements we price accordingly.
Q: How do you price BMS/controls integration?
A: BMS costs include: hardware (controllers, sensors, actuators), software licenses, programming, graphics/dashboards, integration with specialist systems, training, and documentation. Typically 5-15% of MEP costs depending on building intelligence level. We price to BSRIA BG 50/2023 guidance for BMS specification levels.
Q: Can you benchmark our MEP costs against industry standards?
A: Yes, we benchmark against BCIS, Spon’s, and our database of 2000+ projects. We provide £/sqm comparisons by building type, MEP proportion of total project cost, and system-by-system unit rates. This helps identify if your specification is over/under compared to market norms for similar buildings.
Q: What about MEP for renovations/existing buildings?
A: Renovation MEP is more complex due to: surveys of existing services, asbestos/contamination risks, working in occupied buildings, phasing/temporary services, tying into existing systems, and unknowns behind walls/ceilings. We typically add 15-25% contingency for existing building MEP work and recommend intrusive surveys to reduce uncertainty.
Q: How do you handle long lead equipment pricing?
A: For major equipment (chillers, generators, switchgear, UPS), we obtain budget quotations from manufacturers/suppliers and include delivery lead times in our assessment. We flag critical path items and recommend early procurement. We also model currency risk for imported equipment and inflation scenarios for long-lead items.
Why Choose BIM Takeoff for MEP Costing?
MEP Specialist Team
Engineers & Cost Consultants
Our team includes chartered M&E engineers who understand system design, not just cost data. We speak the same language as your MEP consultants and can validate design assumptions, identify missing systems, and flag over/under-specification. This engineering knowledge ensures our estimates reflect real-world installation complexity.
Complex Systems Experience
Data Centers to Operating Theatres
We’ve costed MEP for the most demanding applications: Tier IV data centers with 2N+1 redundancy, hospital operating theatres with HTM 03-01 compliance, pharmaceutical clean rooms with ISO Class 5, and industrial facilities with hazardous area equipment. If it’s technically complex, we’ve estimated it.
BIM-Native Approach
Coordinated Model Extraction
We work directly with federated MEP models, running clash detection before quantity extraction. This means our quantities are clash-free and installation-ready. We also provide coordination reports identifying design issues that could impact cost - giving you visibility before problems arise on site.
Proven Accuracy
±3% on Complex MEP
Our MEP estimates achieve ±3-5% accuracy when working from LOD 350+ coordinated models. This is significantly better than industry standard ±10-15% for MEP work. This precision comes from complete system extraction, specialist engineering input, and comprehensive allowance for testing, commissioning, and integration.
Ready for Precise MEP Costing?
Don’t Let MEP Uncertainty Derail Your Project
Get clash-free, system-validated MEP quantities from specialists who understand the engineering.
Free MEP Assessment
Model review and costing approach discussion
Sample MEP Breakdown
See system-by-system cost analysis
Get Custom Quote
Project-specific pricing within 24 hours
Chartered M&E Engineers
±3% Accuracy on Coordinated Models
Clash Detection Included
20 Years Complex Systems Experience