Construction Data Management & ISO 19650 Compliance
Transform Information Chaos Into Strategic Asset
ISO 19650 compliant information management.
From tender through handover and beyond.
ISO 19650 Compliance - UK BIM Framework adherence
CDE Setup & Management - Structured data environments
Golden Thread - Full lifecycle information management
Why Data Management Matters More Than Ever
The Cost of Information Failure
Poor data management creates expensive problems:
5-15% project time wasted finding information
Rework from using wrong document versions
Compliance failures (Building Safety Act, Golden Thread)
Incomplete handover information
O&M manuals missing critical data
Legal exposure from poor records
Regulatory Imperative
“The Building Safety Act 2022 and Golden Thread requirements make structured information management a legal necessity for high-risk buildings. Poor data management is no longer just inefficient - it’s illegal.”
Our Information Management Solution
ISO 19650 compliant, lifecycle-focused data management:
ISO 19650 compliance - UK BIM Framework adherence
Structured CDE - Everyone finds information instantly
Version control - No more wrong-drawing mistakes
Golden Thread ready - Building Safety Act compliance
Digital handover - Complete, structured O&M data
Audit trail - Full lifecycle documentation
Our Comprehensive Data Management Services
End-to-End Information Management
BIM Strategy & EIR
Information Requirements
- Employer’s Information Requirements (EIR)
- BIM Execution Plan (BEP) preparation
- Information delivery schedules
- Level of Information Need definitions
- Data drop specifications
- Task Team mobilization plans
Deliverable: ISO 19650-compliant documentation suite
CDE Implementation
Common Data Environment
- Platform selection (BIM 360, Asite, 4Projects)
- Folder structure and naming conventions
- Workflow configuration
- Permission and access control
- Integration with existing systems
- User training and onboarding
Deliverable: Fully operational CDE with trained users
Data Coordination
Information Management
- Model coordination (clash detection)
- Drawing register maintenance
- Version control management
- Design development tracking
- RFI and query management
- Change order documentation
Deliverable: Coordinated, clash-free information
Quality Assurance
Information Validation
- Model quality checks (LOD verification)
- Data completeness validation
- Naming convention compliance
- Metadata verification
- Clash detection and resolution
- Information container reviews
Deliverable: Quality-assured information containers
Digital Handover
Asset Information Model
- As-built model validation
- O&M manual compilation
- Asset register creation
- COBie data delivery
- CAFM system population
- Warranty and certification collection
Deliverable: Complete digital Asset Information Model (AIM)
Golden Thread
Building Safety Act Compliance
- HRB (High-Risk Building) information
- Safety case documentation
- Change control procedures
- Resident engagement information
- Building control submission documentation
- Gateway submission support
Deliverable: Compliant Golden Thread of information
Scalable services: Select individual elements or comprehensive lifecycle information management.
Our Proven 6-Step Data Management Process
Step 1: Information Requirements Definition
Duration: 1-2 weeks
What We Do:
- Review project scope and client objectives
- Define Employer’s Information Requirements (EIR)
- Establish Level of Information Need
- Create information delivery schedule
- Define data drop requirements
- Prepare appointment documents
What You Receive: Comprehensive EIR and information protocols
Step 2: BIM Execution Planning
Duration: 2-3 weeks
What We Do:
- Mobilize Task Team responses to EIR
- Develop pre-appointment BEP
- Coordinate Task Information Delivery Plans (TIDP)
- Establish information production methods
- Define quality assurance procedures
- Finalize post-appointment BEP
What You Receive: Agreed BIM Execution Plan (BEP)
Step 3: CDE Setup & Configuration
Duration: 2-4 weeks
What We Do:
- Select and procure CDE platform
- Configure folder structures and workflows
- Implement naming conventions
- Set up access permissions and security
- Integrate with project systems
- Conduct user training sessions
What You Receive: Operational Common Data Environment
Step 4: Ongoing Information Management
Duration: Throughout project lifecycle
What We Do:
- Maintain document registers and logs
- Coordinate information exchanges
- Conduct quality checks on submissions
- Manage model coordination and clash detection
- Support data drop preparations
- Facilitate information reviews
What You Receive: Continuous information management support
Step 5: Digital Handover Preparation
Duration: 6-12 weeks before practical completion
What We Do:
- Compile as-built information
- Validate model accuracy (vs as-built)
- Prepare O&M manuals and documentation
- Create asset registers and COBie data
- Collect warranties and certificates
- Prepare Asset Information Model (AIM)
What You Receive: Complete digital handover package
Step 6: Post-Occupancy Support
Duration: Ongoing (optional)
What We Do:
- Transition AIM to facilities management
- Provide CAFM system support
- Update information for changes
- Maintain Golden Thread documentation
- Support building safety compliance
- Enable asset lifecycle management
What You Receive: Sustained information value through operations
Project Lifecycle: Tender → Design → Construction → Handover → Operations
ISO 19650 & UK BIM Framework Compliance
Standards We Implement
Full compliance with UK and international standards:
ISO 19650-1 - Concepts and principles
ISO 19650-2 - Delivery phase
ISO 19650-3 - Operational phase
ISO 19650-5 - Security-minded approach
BS EN 17412-1 - Level of Information Need
UK BIM Framework - v3 guidance
Building Safety Act 2022 - Golden Thread
Data Exchange Formats
We work with all major industry formats:
IFC - Open BIM standard (IFC2x3, IFC4)
BCF - BIM Collaboration Format (issue tracking)
COBie - Construction Operations Building information exchange
Native Formats - Revit, ArchiCAD, Tekla, Navisworks
PDF/A - Long-term archival formats
Excel/CSV - Data schedules and registers
CDE Platforms We Support
Autodesk Platforms
BIM 360, Autodesk Construction Cloud (ACC), Collaboration for Revit
UK Market Leaders
Asite, 4Projects, Viewpoint, Causeway, BIW Technologies
International Solutions
Trimble Connect, Bentley ProjectWise, Oracle Aconex, Procore
Open-Source Options
SharePoint with custom workflows, Alfresco, self-hosted solutions
What’s Included in Our Data Management Services
Core Deliverables
Every data management engagement includes:
Information Requirements (EIR, BEP, TIDP)
CDE Configuration (structure, workflows, permissions)
Naming Conventions (BS 1192, Uniclass 2015)
Quality Assurance (model checks, data validation)
User Training (team onboarding and support)
Documentation (procedures, standards, templates)
Optional Enhancements
Extend your information management:
Dedicated Information Manager - Full-time resource
Model Coordination Services - Weekly clash detection
Golden Thread Compliance - Building Safety Act support
CAFM Integration - Link to FM systems (Maximo, Archibus)
Data Migration - Legacy system transfers
Audit Services - ISO 19650 compliance audits
Post-Occupancy Support - Ongoing FM data management
Frequently Asked Questions
Q: Do we really need ISO 19650 compliance for our project?
A: For UK public sector projects, yes - it’s mandatory. For private projects, it’s highly recommended and increasingly expected by clients. Benefits include: reduced information risk, better handover quality, legal protection, and improved project outcomes. For high-risk buildings (HRBs), compliance is legally required under the Building Safety Act 2022.
Q: What’s the difference between a CDE and just using SharePoint or Dropbox?
A: A proper CDE includes: structured workflows (WIP → Shared → Published → Archived), version control, audit trails, permissions management, collaboration tools, and integration with project software. SharePoint can be configured as a CDE but requires significant customization. Generic file sharing (Dropbox, Google Drive) lacks the controls needed for compliant information management.
Q: When should we start information management on a project?
A: Ideally at tender stage or project inception. Early engagement allows us to shape the EIR, establish proper foundations, and train teams before problems arise. Mid-project rescue is possible but more challenging and expensive. Golden rule: start information management before design teams start producing information.
Q: Can you help with Building Safety Act compliance and Golden Thread?
A: Yes! We specialize in Golden Thread implementation for high-risk buildings (HRBs). This includes: safety case documentation, change control procedures, digital record-keeping, resident engagement information, and Building Safety Regulator submission support. We’ve worked on multiple Gateway 2 and Gateway 3 submissions.
Q: What if our design team already has a CDE? Do we still need your help?
A: We can still add value through: EIR development, information coordination across Task Teams, quality assurance, model federation, clash detection, handover preparation, and ensuring ISO 19650 compliance. Many projects have multiple CDEs (designer, contractor, client) requiring coordination - we manage these interfaces.
Q: How much does information management cost?
A: Depends on project size and service scope. Setup (EIR, BEP, CDE config) for a £10M project: £15K-25K. Part-time Information Manager support: £3K-5K/month. Full-time dedicated resource: £6K-10K/month. Golden Thread services: £20K-50K depending on building complexity. Investment typically saves 2-5x through reduced rework and better project outcomes.
Q: Can you take over information management mid-project if things aren’t working?
A: Yes, we do project rescues regularly. We’ll assess current situation, identify gaps, implement remedial actions, establish proper processes, and bring project back to compliant state. Most mid-project issues stem from poor initial setup or inadequate resources. Timeline for rescue: 4-8 weeks depending on mess level.
Q: What happens to the data after project handover?
A: We prepare complete Asset Information Model (AIM) containing all as-built information, O&M manuals, warranties, and asset data. This transitions to the client’s facilities management system (CAFM) or is maintained in a dedicated operational CDE. We can provide ongoing support for FM data updates, ensuring the Golden Thread continues through building operations.
Q: Do you provide training for our internal team?
A: Yes! Training is essential for successful adoption. We provide: CDE user training (basic and advanced), Information Manager workshops, ISO 19650 awareness sessions, BEP development training, and custom sessions for specific roles (designers, contractors, FM teams). Training can be on-site or virtual, with materials and ongoing support included.
Ready for Professional Information Management?
Transform Data Chaos Into Strategic Advantage
ISO 19650 compliant information management from experts who understand construction.
Request Consultation
Discuss your information needs
See CDE Examples
Review implementation case studies
Get Quote
Scoped proposal within 3 days
ISO 19650 Certified Specialists
Building Safety Act Compliant
CDE Platform Agnostic
20 Years International Experience
Need Help Now?
Contact: info@bimtakeoff.com | +44 (0) 20 3239 9967
Office Hours: Monday-Friday, 9:00-17:00 CET
:::